OUR RESULT is implementation of projects, by ensuring our clients the results they expect, while emphasizing high quality standards, professional service, safety and sustainable value.
Turbines, electric installation, water circulation system, steam generators and other auxiliary systems were dismantled according to the special dismantling plan
Period of works:
2022
World‘s largest factories of petrochemical refinery and manufactorer, Belgium
Project:
Factories of petrochemical refinery and manufactorer
Scope of works:
Repair work, removal of old tin and wool, renovation works, work with Foamglass and mineral wool
Period of works:
2022
Diesel refinery project, Finland
Project:
Diesel refinery
Scope of works:
Insulation on pipes and tanks, coating with wool and cladding
Period of works:
2021-2022
Paper Mill factory, Sweden
Project:
Paper Mill factory
Scope of works:
Insulation works with wool and cladding on pipes and tanks, Armaflex, Armagel
Period of works:
2021-2022
Farmsum, Netherlands shipyard
Projects:
Shipyard
Scope of works:
Various ship insulation, cotton wool coating, pipe insulation, tinning, welding
Period of works:
2020-2021
Combined cycle power plant, France
Project:
Combined cycle power plant
Scope of works:
Insulation boiler tinning works, mainly pipelinesCombined cycle power plant
Period of works:
2021-2022
Glass and cans recycling factory, Italy
Projec:
Glass and cans recycling factoryI
Scope of works:
Insulation of a filter, a cyclone and raw gas lines
Period of works:
2022
Germany's Industriepark Infraserv, Frankfurt
Project:
2 boilers and equipments
Scope of works:
25.000 m².
Period of works:
2022
Europoort, The Netherlands
Project:
Floating platforms in port
Scope of works:
Erection and modification of scaffolding
Period of works:
Started 2022.04 - continuing
Shipyard in Vlissingen, The Netherlands
Project:
Shipyard
Scope of works:
Erection, modification and dismantling of scaffolding
Period of works:
2022
Civil objects, Groeningen, The Netherlands
Project:
Private, civil buildings
Scope of works:
Erection, modification and dismantling of scaffolding
Period of works:
2022.03 - 2022.06
Civil objects, Haarlem, The Netherlands
Project:
Private, civil buildings
Scope of works:
Erection, modification and dismantling of scaffolding
Period of works:
2022.03 - 2022.06
Concreting of wind turbine foundations, Belgium
Project:
Foundations of wind farms
Scope of works:
Preparation of wind power plants foundations: tying of reinforcement and concreting of foundations
Period of works:
2024
Artificial energy island in the sea, Netherlands
Project:
The world's first artificial energy island in the North Sea
Scope of works:
Tying of reinforcement and concreting
Period of works:
2024 - till now
Construction of a new factory, Lithuania
Project:
Construction of a new 7,400 square meter factory
Scope of works:
Reinforced concrete structure installation works
Period of works:
2024 - till now
Wind turbines, Belgium
Project:
Foundations of wind farms
Scope of works:
Preparation of wind power plants foundations: tying of reinforcement and concreting of foundations
Period of works:
2023
Construction of apartments, Lithuania
Project:
Apartments
Scope of works:
Completed all concreting works required for the project
Period of works:
2022 - 2023
Oil refinery, Lithuania
Project:
Oil refinery
Scope of works:
Tying of reinforcement and concreting
Period of works:
2023 - 2024
Commercial buildings, Iceland
Project:
Commercial buildings
Scope of works:
Concreting, installation of ceilings and wallformwork, wall-ceiling reinforcement.
Construction of formwork, tying of reinforcement, preparation for laying of communications, preparation of the floor for concreting, preparation of the pool for concreting, construction of wall formwork and tying of reinforcement, dismantling and cleaning of formwork.
Period of works:
2021-2022
Commercial buildings, Sweden
Project:
Commercial buildings
Scope of works:
Tying of floor reinforcement, concreting of floor plate seams, construction of formwork, A1 class floor concreting, concrete scrubbing.
Period of works:
2021-2022
Electrical installation, Belgium
Project:
Commercial buildings
Scope of works:
Installation of cable tracks and cables, installation and connection of lighting, equipmnt connection and switching works, installation of floor boxes and plug sockets
Period of works:
2022 11 - till now
Electrical substation installation works, The Netherlands
Project:
Installation of electrical substations
Scope of works:
Outdoor electrical works, installation of electric underground cables in intermediate electrical panels, assembly and connection of intermediate electrical panels
Period of works:
2022 12- till now
Installation of electrical equipment for a sports center, Lithuania
Project:
Installation of electrical equipment for a sports center
Scope of works:
Installation of metal structures, laying of cables, installation of electrical equipment - connection
Period of works:
2021
Electrical installation works for a shopping center, Lithuania
Project:
Electrical installation works for a shopping center
Scope of works:
Installation of metal structures, laying of cables, installation of electrical equipment - connection. Connecting the installation of the electrical panel.
Period of works:
2023
Installation of electrical systems for a shopping center, Lithuania
Project:
Installation and connection of electrical systems
Scope of works:
Installation of metal structures, laying of cables, installation of electrical equipment - connection, installation of video surveillance cameras, installation of evacuation system.
Period of works:
2022
Wind farms, Baltic states
Project:
8 wind turbines, 117m high
Scope of works:
Concreting platforms
Period of works:
2020
Wind farms, Lithuania, Latvia
Project:
19 wind turbines, pads and tower - 117m high
Scope of works:
Concreting platforms
Period of works:
2020 - 2021
Grain elevator with warehouse, Lithuania
Project:
Construction of grain elevator with warehouse
Scope of works:
Concreting works for 4 1500t towers, 15 m high
Period of works:
2020 - 2021
Building for production and industrial use
Project:
Construction of 537,02 sq.ft. building
Scope of works:
Building height – 7,39m; Building volume - 3947,49 sq.ft. Boiler room up to 19.90 MW. Power with two natural gas boilers and storage capacity 4000 m³.
Period of works:
2021
Electrical substation installation works, Belgium
Project:
Electrical substation
Scope of works:
Installation of high-voltage electrical lines
Period of works:
2023
Solar panels
Project:
Solar panel park
Scope of works:
Installation and testing of solar panel equipment
Period of works:
2022
Electric bus factory, Belgium
Project:
Electrical bus factory
Scope of works:
Installation of new electrical wiring
Period of works:
2023
Electrical installation for a factory, Finland
Project:
Electrical installation for a factory
Scope of works:
Connection of low electrical currents, laying of cables, installation of automation
Period of works:
2023
Private, civil buildings, south Sweden
Project:
Private, civil buildings
Scope of works:
Erection, modification and dismantling of scaffolding
Period of works:
2024 - till now
Scaffolding installation at an infrastructure site, central Sweden
Project:
Infrastructure site - tunnel
Scope of works:
Erection, modification and dismantling of scaffolding
Period of works:
2024 - till now
Construction of apartment buildings, central Sweden
Project:
Private, civil buildings
Scope of works:
Erection, modification and dismantling of scaffolding
Period of works:
2024 - till now
Construction of private, civil, and industrial buildings, north Sweden
Project:
Private, civil and industrial buildings
Scope of works:
Erection, modification and dismantling of scaffolding